Solar-Log1000: Configuration at the unit
Configuring e-mail and SMS messages (Internet/Email/SMS)
238 of 268 Solar-Log
1000/500/200
Installation
Procedure
Select 1 the required type of notification (by email and/or by SMS).
2 Touch the input box beside Send time
The virtual keyboard is opened.
3 Enter the desired sending time and confirm with OK
4 Touch Save, then Next to go to the next dialogue.
Testing the connection
This dialogue can be used to test the settings for SMS and e-mail by making a
test transmission.
Dialogue boxes
Test EMail, Test SMS
These buttons are used to start the test transmissions.
Last transmission
Display field: Time of last transfer
Status
Display field: Status of last transfer ( Page 257)
Procedure
1 Touch the button beside desired test
An information window appears after the test, so that the status can
be checked on the display.
2 Touch Save if the test was successful, otherwise touch
Back to check and correct the connection data.