Starting up
Initial startup of Solar-Log200
142 of 268 Solar-Log
1000/500/200
Installation
3 On the navigation bar at the top, click on Configuration
The initial configuration window is opened.
The dialogue window is divided into sections that allow you to
Adjust the Date/Time
Configure the SMA Bluetooth (only for Solar-Log
200
BT)
Select the inverter on RS-485/422-B.
Date and Time section
In the initial configuration, the date and time must be checked and adjusted if
necessary. The Solar-Log
200
is preset at the factory. However, the settings
may be lost due to long periods of storage without a power supply.
To adjust the time display (Date/Time)
1 Enter the correct time in the New input box, in the same format as in the
display field above it
2 Click on Save