Illustration 8.6: Set Date
Set date as prompted by the display. Press
'OK' to select. Press
’ to scroll up through
the numbers. Select by pressing 'OK'.
Chinese date format: yyyy-mm-dd.
Illustration 8.7: Installed PV Power
Enter the amount of installed PV power for
each of the PV inputs. When two or more PV
inputs are connected in parallel, each PV in-
put in the parallel group must be set to the
total amount of PV power installed to that
group divided by the number of parallel in-
puts. See the table below for examples of in-
stalled PV power.
Illustration 8.8: Select Grid Code
The display will now show “Select grid”. The
grid code is set to “undefined” at initial start-
up. To select grid code, press 'OK'. Press
to scroll down through the list of coun-
tries. Select the grid code for the installation
by pressing ‘OK’. To meet medium-voltage
grid requirements select a grid code ending
in MV. It is very important that the correct
grid code is chosen.
8. User Interface
L00410582-01_02 73
8